
Positioning of the template and injection of the epoxy resin after cleaning the holes.
The insert is positioned above the structural element to be reinforced and is provisionally fixed to the reinforcing iron at the corner. This facilitates the drilling phase. The element functions as a guide for the position of the holes to be drilled in the concrete.